Mono & polycrystalline panels
Solar Rooftop (PV)
Grid-tie and off-grid photovoltaic systems for homes, businesses and industry — sized from a single home to a factory roof.
- Residential 1 kW – 10 kW
- Commercial 10 kW – 500 kW
- Type Mono / Poly

Overview
A rooftop solar photovoltaic system turns sunlight into electricity right where you use it — cutting your dependence on the grid and shrinking your monthly bill. Surya Urja designs, supplies and installs grid-tied, hybrid and off-grid PV systems sized from a single-phase home connection to a megawatt-scale factory roof.
Every system is engineered for Indian conditions: high-efficiency mono PERC modules, IP-rated string or micro-inverters, and hot-dip galvanised mounting built to ride out monsoon winds and peak-summer heat. Grid-tied systems support net metering, so the surplus you export in the daytime spins your meter backwards.
Our product film
Power your home.Power a better tomorrow.
Generate your own clean energy with Surya Urja solar rooftop solutions. Save on electricity bills while contributing to a greener, brighter future.
Clean energy
100% renewable and eco-friendly
Low electricity bills
Reduce your bills significantly
Reliable performance
Designed for Indian conditions
Built to last
High-quality, durable systems
Highlights
Why it stands out
The engineering details that make the Solar Rooftop (PV) a dependable, long-term choice.
Grid-tie, hybrid or off-grid
Net-metered grid-tie for the fastest payback, hybrid with battery for power-cut backup, or fully off-grid where the grid does not reach.
Mono PERC & polycrystalline
High-efficiency monocrystalline PERC modules for tight roofs; cost-effective polycrystalline where space is generous.
Net-metering ready
Export surplus daytime generation to the grid and draw it back after dark — your bi-directional meter does the accounting.
Subsidy & DISCOM support
Eligible homes can claim the PM Surya Ghar: Muft Bijli Yojana rooftop subsidy. We handle the application and DISCOM liaison.
Built for the roof
Galvanised or aluminium mounting rated for high wind and corrosion — safe on coastal, industrial and high-rise sites.
Monitor from your phone
Wi-Fi inverter monitoring shows daily yield, lifetime savings and fault alerts on a simple app.
Specifications
Technical specifications
System
- Residential
- 1 kW – 10 kW
- Commercial / industrial
- 10 kW – 1 MW+
- Configuration
- Grid-tie / Hybrid / Off-grid
Modules
- Cell technology
- Mono PERC / Polycrystalline
- Module power
- 400 – 550 Wp (typical)
- Performance warranty
- Up to 25 years*
Balance of system
- Inverter
- String / micro, MPPT
- Mounting
- Galvanised / aluminium
- Monitoring
- Wi-Fi app
Specifications are indicative and configured to your requirement. Ask for exact specs →
Scope of supply
What's included
- High-efficiency PV modules
- Grid-tie / hybrid inverter
- Mounting structure & rails
- DC & AC cabling and conduits
- Earthing & lightning arrestor
- AC/DC distribution & protection
- Net-meter coordination
Final scope depends on site conditions and capacity. We confirm everything during the survey.
Applications
Where it's used
From a single installation to a large project, the Solar Rooftop (PV) suits a wide range of settings across homes, institutions and industry.
- Homes & villas
- Housing societies & apartments
- Schools, colleges & hospitals
- Factories & warehouses
- Offices & commercial buildings
- Petrol pumps & cold storage
Assurance
The Surya Urja standard
- Certified components, built to standard
- Savings of up to 80% on energy bills
- All-weather performance, built for India
- Low-maintenance, long service life
- 5-year manufacturer warranty*
Manufactured in Anand, Gujarat · installed and serviced by our own team.
FAQ
Questions, answered
How much roof area do I need?
Roughly 80–100 sq ft of shadow-free roof per kW. A typical 3 kW home system needs about 250–300 sq ft.
Will it work during a power cut?
A standard grid-tie system shuts off during outages for lineman safety. Choose a hybrid system with battery backup to keep essential loads running.
What about the government subsidy?
Residential rooftop is eligible under PM Surya Ghar: Muft Bijli Yojana. We assess your eligibility, file the application and coordinate with your DISCOM.
How long does it last and what maintenance is needed?
Modules are built for 25+ years; inverters typically 8–12. Maintenance is minimal — periodic cleaning and an annual health check.
Explore
Related products
Request a quote for the Solar Rooftop (PV)
Tell us your requirement and our engineers will size the right system and share pricing — no obligation.

